New, high-quality office space for 206 Marylebone Road

Have your say on proposals for 206 Marylebone Road

Berkeley Estate Asset Management (BEAM), the long term owners of 206 Marylebone Road, are pleased to launch the second round of consultation on our proposals to provide high-quality office space at this site while protecting its unique character.
The public consultation seeks your views on our developed proposals, and anything you would like us to consider before submitting a planning application to Westminster City Council.
Scroll down to read more and to share your views on our proposals

History of the building

The site comprises two distinct buildings; a purpose-built headquarters building for the National Cash Register Company dating to the 1930’s and subsequent northern extensions dating to the 1960’s.

The need to refine the existing planning permission

There have been previous plans to refurbish, alter and extend the the existing building to bring it back to life, given it has sat empty for almost 9 years, since mid-2015. There have been a whole number of challenges associated with delivering these permissions whilst working within the structural constraints of the existing building.

The current ceiling heights are significantly below market expectations and there are problems presented by the existing structure and beams. This requires us to refine the permission in order to ensure it can deliver high-quality future proofed floorspace.

The office market has changed – businesses are more demanding of the spaces they occupy, as they seek to compete with the shift towards home-working. Sustainability and performance of building stock is also under increased scrutiny as we tackle a climate emergency.

Having thoroughly considered the options over several years, we are proposing the retention of the iconic 1930s façade, combined with a sensitive redevelopment of the internal structure.This approach will revitalise this vacant building, create job opportunities and benefit the local economy – while ensuring environmental sustainability is at the centre of our approach.

Initial Consultation

In November/December 2023, we held an initial consultation on our evolving proposals. Thank you for everyone who engaged with us throughout the process. You can view the exhibition boards we showed during this consultation here.
The Site

Planning History

As you can see from the timeline, there have been previous plans to refurbish, alter and extend the existing building to bring it back to life, given it has sat empty for over 8 years, since mid-2015.

There have been a number of challenges associated with delivering these permissions whilst working within the structural constraints of the existing buildings. The current ceiling heights are significantly below market expectations and there are problems presented by the existing structure and beams.

This requires us to refine the permission in order to ensure it can deliver a feasible proposal and the right long-term outcome for this site.

Having thoroughly considered the options over several years, we are proposing the retention of the iconic 1930s façade, combined with a sensitive redevelopment of the internal structure. This approach will revitalise the presently unused building, create job opportunities,  benefit the local economy, while ensuring environmental sustainability is at the centre of our approach.

Our Proposals

Enhancing and protecting the existing 1930s facade

Revitalising existing site which has been empty since 2015

Reusing existing foundations to minimise embodied carbon

Enhanced urban greening, landscaping and sustainable travel facilities

High environmental targets and an all-electric building

Delivery of new, high-quality flexible modern office floorspace supporting job creation and economic benefits to the local area

Developing our proposals

Our proposals seek to redevelop the building behind the 1930s facade, to create new high-quality office space. The proposals are an evolution of the existing consent, tackling a number of challenges which have emerged. The existing consent would have created severely compromised floorspace as a result of the highly bespoke and irregular existing structural frame, with low floor to ceiling heights and oppressive downstand beams that would restrict daylight penetration and future flexibility. A highly sustainable building will be created instead, by re-using large quantities of the existing façade materials and utilising a highly flexible hybrid CLT and steel system for the new structural frame. This will maximise floor to ceiling heights within the confines of the existing 1930s façade window lines, whilst remaining highly adaptable to ensure the building is truly future proofed for generations to come.

Delivery of new, high-quality flexible modern office floorspace supporting job creation and economic benefits to the local area

The current building has disconnected floorplates, and low floor-to-ceiling heights that make it unappealing to new office occupiers. Our proposals would create high-quality flexible office space to meet the demands of new office occupiers in this central location.

The building will provide flexible modern office floorspace, suitable for a range of different size occupiers, to support capacity for economic development, job creation, and meet growing business needs.

Sustainable development

The 1930s facade and basement will be retained, with further material reuse. We are exploring innovative methods of incorporating the existing stone into the new building, including the crushing of bricks to create textured Terrazzo.

Enhanced urban greening and landscaping

We are looking to incorporate green roofs, created with local plant species, and landscaped to thrive in its environment. Wildflowers will promote pollination, working alongside wider efforts to improve urban greening across Marylebone.

Quidam officiis similique sea ei, Lorem sit eu vel tollit indoctum

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis
Placeholder for Exhibition Boards embed after the exhibition
****Here put the html code embed ****
Note: delete the fixed height and the background colour

Consideration 1

Lorem ipsum dolor sit amet, lorem sit eu dolor panellesque consectetur adipiscing sit dolor.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo lorem elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus.

Proin sed tincidunt augue. Fusce gravida augue in est dapibus, ac convallis leo tempus. Proin auctor urna ut justo bibendum, et tincidunt erat congue. Suspendisse tempus lorem purus, luctus ornare felis vestibulum sed.

Lorem ipsum dolor sit amet, lorem sit eu dolor panellesque consectetur adipiscing sit dolor.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo lorem elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus.

Proin sed tincidunt augue. Fusce gravida augue in est dapibus, ac convallis leo tempus. Proin auctor urna ut justo bibendum, et tincidunt erat congue. Suspendisse tempus lorem purus, luctus ornare felis vestibulum sed.

Lorem ipsum dolor sit amet, lorem sit eu dolor panellesque consectetur adipiscing sit dolor.

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo lorem elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus.

Proin sed tincidunt augue. Fusce gravida augue in est dapibus, ac convallis leo tempus. Proin auctor urna ut justo bibendum, et tincidunt erat congue. Suspendisse tempus lorem purus, luctus ornare felis vestibulum sed.
Indicative images

Quidam officiis similique sea ei, Lorem sit eu vel tollit indoctum

Design and Massing
The proposed height and massing will remain in line with the the consented scheme. The design process for the new facade is aimed at creating an elegant new extension, subservient to the existing 1930s building.

View along Great Central Street

View across Marylebone Road

View from East along Marylebone Road

Proposed view along Balcombe Street

Proposed view from the north
The team

About Berkeley Estate Asset Management

Berkeley Estate Asset Management takes a holistic approach to realising value across individual assets and entire estates on behalf of our clients.  

Our commitment to ESG underpins our decision making at every level. We strive to be leaders in innovation across our developments, the communities we work in, and our business and supply chains. 

The team at Berkeley Estate Asset Management takes collective and individual responsibility to be leaders in ESG. We have set ambitious and measurable targets – at both a corporate level and for each asset under management, with a clear pathway to being Net Zero Carbon by 2030. 

To achieve this, we have created a framework of guiding principles, ensuring that we minimise the impact of our actions, improve wellbeing and deliver desirable, highly efficient buildings that are environmentally future-proofed and that generate durable long-term returns. 

The wider team

Have your say

In 2023, we held our first consultation where we received feedback on our initial vision for 206 Marylebone Road. We have continued to develop our proposals to bring this site back into use.

Ahead of submitting an application to Westminster City Council, we are keen to hear your views on our developed proposals.

Public
Exhibition 1

Online
Survey